Skip to content
EEEP
Menu
  • 2012
    • Volume 1
      • Number 1
      • Number 2
      • Number 3
  • 2013
    • Volume 2
      • Number 1
      • Number 2
  • 2014
    • Volume 3
      • Number 1
      • Number 2
  • 2015
    • Volume 4
      • Number 1
      • Number 2
  • 2016
    • Volume 5
      • Number 1
      • Number 2
  • 2017
    • Volume 6
      • Number 1
      • Number 2
  • 2018
    • Volume 7
      • Number 1
      • Number 2
  • 2019
    • Volume 8
      • Number 1
      • Number 2
  • 2020
    • Volume 9
      • Number 1
      • Number 2
  • 2021
    • Volume 10
      • Number 1
      • Number 2
    • Volume 9
      • Number 2
  • 2022
    • Volume 10
      • Number 2
    • Volume 11
      • Number 1
      • Number 2
  • 2023
    • Volume 11
      • Number 2
    • Volume 12
      • Number 1
      • Number 2
  • 2024
    • Volume 13
      • Number 1
      • Number 2
  • 2025
    • Volume 14
      • Number 1
  • 2026
    • Volume 15
      • Number 1
      • Number 2
Menu

EEEP » 2022 » Volume 11 » Number 1 » Cost Efficiency Evaluation of Thermal Power Plants in Bangladesh Using a Two-Stage DEA Model

Cost Efficiency Evaluation of Thermal Power Plants in Bangladesh Using a Two-Stage DEA Model

Posted on February 4, 2026February 9, 2026 by admin

The power sector in Bangladesh is based on fossil fuel based electricity generation. The recent increase in generation capacity in the country has been through the addition of power plants using higher cost imported fossil fuels, which have increased the overall cost of electricity. In this study, we aim to compare the cost efficiencies of thermal power plants in Bangladesh in order to identify sources of inefficiencies. We use data envelopment analysis, followed by Tobit regression. We separately analyze two samples comprising 30 baseload plants and 91 peaking plants for the financial year 2019–2020. We find that base load plants have higher efficiencies in general, and have lower slacks in input factors, compared to peaking plants. Fuel costs and fixed costs have the highest slacks whereas operations and maintenance costs and installed capacity have low slacks. It is also shown that the type of fuel in the power plant is the most important determinant of its cost efficiency, among both base load and peaking plants. The ownership of the plant or the technology has no significant effect. These findings have policy implications for the future expansion of the power sector and replacement of inefficient power plants in the energy transition process.

Authors: Shahriar Ahmed Chowdhury, Shakila Aziz, and Muhammad Bellal Hossan
DOI: 10.5547/2160-5890.11.1.scho
Keywords: Bangladesh, DEA, thermal power plants, Tobit analysis
🔐 Download PDF🔐 Executive Summary PDF

Account

  • Log in

Tags

Air pollution carbon emissions Carbon tax China Climate change climate change policy Climate policy Coal computable general equilibrium Cost of Debt Decentralized energy governance difference-­in-­differences Electricity generation Electricity market design Electricity markets Electric Utilities Energy Energy efficiency Energy Policy Energy R&D Energy security Energy transition environmental regulation Europe evaluation Geopolitics Introduction Investment Long-term contracts Middle East Natural gas Network cost allocation Network expansion planning nuclear power generation Oil prices Regulation Renewable energy Renewables Resilience Resource adequacy Scenarios Sub-Saharan Africa Sustainability sustainable development willingness-to-pay

Archives

  • April 2026
  • March 2026
  • February 2026
© 2026 EEEP | Powered by Minimalist Blog WordPress Theme